Frequently Asked Questions
Straight answers on timelines, cost ranges, materials, permits and warranty for finish carpentry, wood repair and remodeling with PRC Group.
General questions
Are you licensed and insured?
Yes — PRC Group is fully licensed and insured across Massachusetts, and every project is backed by a written workmanship warranty.
How do estimates work?
We visit your home, measure and listen, then send a written, itemized estimate — free and no-pressure. Based in Wakefield, we schedule quickly across the North Shore.
What areas do you serve?
We're based at 86 Albion St, Wakefield, MA 01880 and serve Wakefield and the communities north of Boston, including Winchester, Lynnfield, Reading, Melrose, Stoneham, Lexington, Andover and more.
Finish Carpentry questions
How long does a room of trim take?
A single room of baseboard and casing is usually a day; crown molding, wainscoting or built-ins add time. A whole-house trim package typically runs 1–3 weeks depending on size and detail.
Can you match my home's existing trim?
Yes. We match existing profiles from stock where possible and can have knives ground for exact reproductions when it matters.
Do you install interior and exterior doors?
Both. Interior doors are hung square and cased to the room; exterior doors are set plumb, flashed and sealed so the opening stays weather-tight.
Is the trim left ready to finish?
Yes — fitted, fastened, nail holes filled, joints caulked and sanded. Priming and finish coats belong to a separate trade, and we say so in the estimate.
Repairs & Exterior questions
Can you repair rotted wood instead of replacing everything?
Usually. We cut back to sound material, correct the water path that caused the damage and splice in matching stock — sills, columns, fascia, soffits and trim.
How much does a new deck cost?
Pressure-treated decks typically start around $40–60 per square foot; composite runs higher. We quote exactly after a free site visit.
Do you repair porches as well as decks?
Yes — decking, framing, railings, stairs, columns and skirting. Rotted framing is corrected before any new surface goes down.
Remodeling questions
How long does a kitchen remodel take?
Most kitchens run 4–8 weeks on site once materials are in. Cabinet lead times are the biggest variable, which is why we order early.
How long does a bathroom remodel take?
A typical full bathroom runs about 2–3 weeks on site. Layout changes and custom tile can extend that — we give you a realistic schedule in the proposal.
Do you handle permits, plumbing and electrical?
Yes — we pull the required permits and coordinate licensed plumbing and electrical work, including inspections.
How do payments work?
A deposit secures your slot and materials, followed by progress payments tied to completed milestones — never large sums up front.