πŸ“ Serving all of Massachusetts β€’ πŸ• Mon–Sat, 8AM–6PM

Frequently Asked Questions

Straight answers on timelines, cost ranges, prep, permits and warranty for painting, carpentry and remodeling with PRC Group.

General

General questions

Are you licensed and insured?

Yes β€” PRC Group is fully licensed and insured across Massachusetts, and every project is backed by a written workmanship warranty.

How do estimates work?

We visit your home, measure and listen, then send a written, itemized estimate β€” free and no-pressure. Based in Wakefield, we schedule quickly across the North Shore.

What areas do you serve?

We're based at 86 Albion St, Wakefield, MA 01880 and serve Wakefield and the communities north of Boston, including Winchester, Lynnfield, Reading, Melrose, Stoneham, Lexington, Andover and more.

Painting

Painting questions

How long does it take to paint a room?

A standard bedroom takes about a day including prep and two coats. A whole-house interior typically runs 3–7 days depending on size, repairs and trim work.

Do I need to move out while you paint?

No. We work room by room, use low-odor low-VOC paints and clean up daily, so your home stays livable throughout the project.

When is the best time to paint a house exterior?

Late spring through early fall. Modern acrylics can go on down to about 35Β°F, but we schedule around dry stretches with moderate temperatures for the best cure.

How long should an exterior paint job last?

With proper prep and quality paint, 8–12 years on siding and 4–6 on high-wear spots like decks and south-facing trim. Skipped prep is why cheap jobs peel early.

Carpentry

Carpentry questions

Do you do both carpentry repairs and painting?

Yes β€” one crew, one schedule. Rotted clapboards, damaged trim and the finish coat are all handled in the same project.

How much does a new deck cost?

Pressure-treated decks typically start around $40–60 per square foot; composite runs higher. We quote exactly after a free site visit.

Can you match my home's existing trim?

Yes. We match existing profiles from stock where possible and can have knives ground for exact reproductions when it matters.

Remodeling

Remodeling questions

How long does a kitchen remodel take?

Most kitchens run 4–8 weeks on site once materials are in. Cabinet lead times are the biggest variable, which is why we order early.

How long does a bathroom remodel take?

A typical full bathroom runs about 2–3 weeks on site. Layout changes and custom tile can extend that β€” we give you a realistic schedule in the proposal.

Do you handle permits, plumbing and electrical?

Yes β€” we pull the required permits and coordinate licensed plumbing and electrical work, including inspections.

How do payments work?

A deposit secures your slot and materials, followed by progress payments tied to completed milestones β€” never large sums up front.

Still have a question?

Call us or request a free written estimate β€” we're happy to help.

Call (781) 520-8245